HOW THE TIME IS LOST, EVERY DAY!
Construction Process has four essential phases, in general.
The following:
1.
Planning Phase
a.
Tasks
and objectives.
b.
Articulating
and defining the goals for the project and evaluating the feasibility of the
plan.
c.
The
owner, the architect, the construction manager have early discussions on what
is to be built.
d.
For
architects this phase is called Conceptual Design.
2.
Preconstruction Phase
a.
Tasks
and objectives.
b.
Project
architect commences with construction documents to be submitted for building
permit.
c.
Schematic
Design first – Drawings 20% complete..
d.
Design
Development second – Drawings 70% complete..
e.
Construction
Documents third – Drawings 100% complete.
f.
Total
construction project budget prepared.
g.
Critical
path schedule is prepared.
3.
Construction Phase
a.
Tasks
and objectives.
b.
Construction
manager and contractor will transition the project into actual construction.
c.
Professional
team of architects, engineers and consultants are shaping the Construction
Administration.
d.
Construction
Administration performs quality control inspections, respond to requests for
information, review and approve submittals, etc.
e.
Construction
manager services include on-site project management, oversee quality control and
monitor the contractor’s safety program.
f.
Coordinates
permits, technical inspections, equipment testing and systems commissioning to
ensure they are on track.
4.
Close-out Phase.
a.
Tasks
and Objectives.
b.
More
than completion of the punch list process, is turning over the project to the
client for occupancy.
c.
Clients
must be provided with all project information.
d.
A
construction closeout document list.
e.
All
closeout documents (manuals, warranties, as-builts, final accounting).
f.
A
formalized process called Commissioning delivers the final Commissioning
Report.
g.
Training
the Owner in hoe to use their facility.
WHERE THE TIME IS SPENT?
Generally it is:
Planning Phase |
Pre Construction Phase |
Construction Phase |
Close-out Phase |
20% of time |
30% of time |
40% of time |
10% of time |
WHERE THE TIME IS LOST?
The time is lost between team players, as well as when there is a slow
payment from the owner.
Last reason, is Materials Contacts high rise of prices.
One of the most difficult issues is the team’s history in construction,
whether the team has a long time spent altogether in the past.
Unfortunately! When the construction team is consisted on, mainly, by new
group of engineers in a large scale project then there may be (shall be)
conflicts between parties.
WHAT SLOW PAYMENT MEANS?
Slow payment is the small capability of the owner to finance smoothly a
project.
In this case there shall be time delays, from delivery of materials, as
well as, from subcontracting parts and labor.
WHAT IS THE
ROLE OF THE PROJECT PLANNER?
Project planner
runs the project management tool on behalf of Construction manager so as to
visualize all the project scope, as well as the resources and time plan.
This plan is
to be circulated over the construction administration and updated before every construction
meeting.